Stock Number: 2-02-301917C
Make: Crown
Model: 20WTL
Year: 1973


Stock Number: 2-18-ATT001
Make: Auramo
Model: Attachment
Year: 2004


Stock Number: 268908
Make: Taylor
Model: TE650L
Year: 2000


Stock Number: ATT112
Make: Misc
Model: 48" Lumber Fork
Year: 2008


Stock Number: 209041
Make: CAT
Model: 2ETC3500-48V
Year: 2015


Stock Number: EQU005702
Make: Taylor
Model: THDC955
Year: 2006


 
Comedil Self Erect Cranes

Comedil Self Erect Cranes

Usually the base which is bolted into a huge concrete pad provides the necessary support for a tower crane. The base is connected to a tower or a mast and stabilizes the crane which is attached to the inside of the structure of the building. Usually, this attachment point is to a concrete lift or to an elevator shaft.

The crane's mast is often a triangulated lattice structure which measures 10 feet square or 0.9m2. Connected to the very top of the mast is the slewing unit. The slewing unit consists of a motor and a gear which enable the crane to rotate.

Tower cranes may have a max unsupported height of 80m or 265 feet, while the tower crane's maximum lifting capacity is 16,642 kg or 39,690 pounds with counter weights of 20 tons. In addition, two limit switches are utilized in order to ensure the operator does not overload the crane. There is also another safety feature called a load moment switch to ensure that the operator does not surpass the ton meter load rating. Lastly, the tower crane has a maximum reach of 70 meters or 230 feet.

Due to their extreme heights, there is a science involved to erecting a crane. The stationary structure will first have to be brought to the construction location by utilizing a large tractor-trailer rig setup. Next, a mobile crane is used in order to assemble the machine portion of the crane and the jib. These parts are then connected to the mast. The mobile crane then adds counterweights. Forklifts and crawler cranes may be some of the other industrial machinery which is used to erect a crane.

When the building is erected, mast extensions are added to the crane. This is how the crane's height is able to match the building's height. The crane crew utilizes what is called a climbing frame or a top climber that fits between the top of the mast and the slewing unit. A weight is hung on the jib by the work crew so as to balance the counterweight. Once complete, the slewing unit is able to detach from the top of the mast. In the top climber, hydraulic rams are utilized to adjust the slewing unit up an extra 6.1m or 20 feet. Then, the operator of the crane uses the crane to insert and bolt into place one more mast section piece.

  • CAT Reach Stackers
    For railway handling, this might require larger trucks that are outfitted with both a longer reach and higher lift capacity. You might ... More
  • Hyster Large Capacity Forklifts
    Big and Jumbo Hyster provides a series of masted top pick trucks, the H1050-1150D-CH series, which could handle as much as 88,185 ... More
  • Toyota Order Picker Forklifts
    Among the main problems for many businesses nowadays is effective order picking. The BT Optio Series has been designed by Toyota ... More
  • Daewoo Diesel Forklifts
    A forklift is an important piece of machinery in the material handling business. Also referred to as a powered industrial truck, a ... More
  • Skyjack Articulating Boom Lifts
    What Precisely Is an Articulating Boom Lift? The articulated boom lift is a heavy duty equipment capable of performing various tasks ... More